Installation procedure, Equipment assembly, Installation tools required – Telenetics 2185 User Manual

Page 19: Mechanical installation, Cabling, Installation procedure -3

background image

Telenetics 2185

2-3

INSTALLATION PROCEDURE

Equipment Assembly

The 2185 is shipped as a completely assembled unit with the printed cir-
cuit board and power supply sub-assemblies already installed.No further
assembly is required.

Installation Tools Required

The only tool required is a small slot screwdriver to tighten the screws
securing the interface cable connectors to the connectors on the unit's
rear panel.

Mechanical Installation

The 2185 is a “tabletop” unit.No provisions are made for securing the
unit to any surface.

Cabling

All external connections to the 2185 are made via EIA 232-D, 25-pin,
connectors located on the rear panel (see Figure 2-1) and their associ-
ated straight-through cables.There are six connectors, one for the main
channel, and one for each subchannel.

In Figure 2-1:

Port 0 = Main Channel

Port 1 = Subchannel 1

Port 2 = Subchannel 2

Port 3 = Subchannel 3

Port 0 = Subchannel 4

Port 1 = Subchannel 5