Installation, Figure 23 – Rinnai 37AHB SERIES User Manual
Page 23
Rinnai Corporation Hydronic Furnace (37AHB) Manual
23
Installation
Figure 23:
24V Troubleshooting - Flow Sensor (FS) Configuration
24V BETWEEN THERMOSTAT AND PCB
24V BETWEEN CONDENSING UNIT AND PCB
If a condensing unit and cased coil set is used in conjunction with the Rinnai Hydronic Furnace for cooling,
refer to air conditioning manufacturer's instructions for hook-up and troubleshooting details.
NO
FINISH
ENSURE THAT T'STAT IS IN
HEATING
MODE AND RECHECK
FOR CONTINUITY
NO
NO
YES
CONTACT
TECH. SUPPORT
SYSTEM
WORKING
YES
NO
WITH DOOR SWITCH CLOSED
(SET SYSTEM IN HEATING
MODE -CALL FOR HEAT)
START
IS 'LED' ON
YES
NO
PRI:VAC = 115V +/-
SEC: VAC = 24V +/-
YES
NO
GO TO
HYDRONIC FURNACE START UP
AND 'LED' TROUBLESHOOTING
VAC = 24V +/-
YES
CHECK
3 AMP
FUSE; IS FUSE
INTACT
(1) CHECK FOR
WIRING PROBLEM(S)
(2) CHECK
TRANSFORMER; IF DEFECTIVE,
REPLACE
FAULTY COMPONENT
(1) CHECK
FOR WIRING PROBLEM(S)
(2) CHECK
FUSE; IF DEFECTIVE,
REPLACE
FAULTY COMPONENT
IS THERE
CONTINUITY
AT
T'STAT
CHECK
T'STAT FOR CONTINUITY
WITH OHM METER BETWEEN
'R' AND 'W'
YES
IS THERE
CONTINUITY
AT
T'STAT
YES
CHECK THERMOSTAT;
IF
DEFECTIVE REPLACE
COMPONENT
CHECK
FOR 24 V ACROSS
'WH/FS'
PINS
CHECK PCB;
IF DEFECTIVE
REPLACE
COMPONENT AND
RETURN TO START
NO
CHECK
FOR WIRING
PROBLEM(S) AND REPAIR OR
REPLACE AND RETURN TO
START
CHECK
TRANSFORMER FOR
CORRECT
VOLTAGES