beautypg.com

Temperature controls - installation, Mc-91-1a – Rinnai 26i User Manual

Page 18

background image

18

TEMPERATURE CONTROLS - INSTALLATION

Universal Temperature Controller

MC-91-1A

1. Determine the most suitable position for

the temperature controller.


2. Drill 3 holes in the wall as shown in fig 1,

one for the cable and two for the
securing screws. Ensure holes are
drilled deep enough. Fit wall plugs if
needed. (ensure controller is level.)


3. Run the cable provided through the hole

in the wall-ensuring that the end fitted
with the connector is nearest the
controller. (fig 2.)


4. Remove the face plate from the

controller using a flat screwdriver. Take
care not to damage the cover (fig 3.)


5. Connect the cable to the temperature

controller.


6. Fix the controller to the wall and fasten

with the phillips head screws as shown
in (fig 4.)


7. Remove the protective plastic film from

the controller face as shown in (fig 4.)


8. Replace the face plate.




NOTE

This manual is related to the following products: