Temperature controls - installation, Mc-91-1a – Rinnai 26i User Manual
Page 18
18
TEMPERATURE CONTROLS - INSTALLATION
Universal Temperature Controller
MC-91-1A
1. Determine the most suitable position for
the temperature controller.
2. Drill 3 holes in the wall as shown in fig 1,
one for the cable and two for the
securing screws. Ensure holes are
drilled deep enough. Fit wall plugs if
needed. (ensure controller is level.)
3. Run the cable provided through the hole
in the wall-ensuring that the end fitted
with the connector is nearest the
controller. (fig 2.)
4. Remove the face plate from the
controller using a flat screwdriver. Take
care not to damage the cover (fig 3.)
5. Connect the cable to the temperature
controller.
6. Fix the controller to the wall and fasten
with the phillips head screws as shown
in (fig 4.)
7. Remove the protective plastic film from
the controller face as shown in (fig 4.)
8. Replace the face plate.
NOTE