beautypg.com

Power-on, Operating mbe, Power-off – RAD Data comm MBE10-1D User Manual

Page 39

background image

MBE Family Installation and Operation Manual

Chapter 3 Operation

Operating Instructions

3-3

Power-on

To power-up MBE:
1. Set the POWER switch on the rear panel to the ON position.

The POWER indicator lights up, indicating that MBE is powered on. After
about 1 minute, the operational status screen appears on the terminal
screen.

2. Press the <Enter> key several times to display the password prompt.

Operating MBE

To operate MBE:
1. Configure MBE according to the application (see the

LAN RANger Series

Configuration Guide

).

2. During normal operation (when the remote workstations are active):

The READY indicator lights up continuously

The Tx and Rx indicators blink occasionally

The LAN and LINK error indicators remain OFF.

Power-off

To power-off MBE:
• Set the POWER switch on the rear panel to the OFF position.

Order from: Cutter Networks

Ph:727-398-5252/Fax:727-397-9610

www.bestdatasource.com

This manual is related to the following products: