Power-on, Operating mbe, Power-off – RAD Data comm MBE10-1D User Manual
Page 39
MBE Family Installation and Operation Manual
Chapter 3 Operation
Operating Instructions
3-3
Power-on
To power-up MBE:
1. Set the POWER switch on the rear panel to the ON position.
The POWER indicator lights up, indicating that MBE is powered on. After
about 1 minute, the operational status screen appears on the terminal
screen.
2. Press the <Enter> key several times to display the password prompt.
Operating MBE
To operate MBE:
1. Configure MBE according to the application (see the
LAN RANger Series
Configuration Guide
).
2. During normal operation (when the remote workstations are active):
The READY indicator lights up continuously
The Tx and Rx indicators blink occasionally
The LAN and LINK error indicators remain OFF.
Power-off
To power-off MBE:
• Set the POWER switch on the rear panel to the OFF position.
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com