beautypg.com

Nortec NH Series User Manual

Page 12

background image

10-00

Page 5
2008-08-28

3. PREINSTALLATION EQUIPMENT VERIFICATION

A. GENERAL

(1)

Ensure that available voltage and phase corresponds with humidifier voltage and
phase as indicated on humidifier’s specification label.

(2)

Ensure that the dedicated external fuse disconnect is of sufficient size to handle
the rated amps as indicated on the specification label. Refer to local codes.

(3)

Report any discrepancy immediately to the site engineer.

(4)

Location and mounting is described in Chapter 10-10.

(5)

Typical installation (See Figure 6.) shows the references to the appropriate
chapter of the manual.