Nortec NH Series User Manual
Page 10
10-00
Page 3
2008-08-28
1. PRE-INSTALLATION
A. RECEIVING & UNPACKING EQUIPMENT
(1)
Check packing slip to ensure ALL material has been delivered.
(2)
All material shortages are to be reported to NORTEC within 48 hours from receipt
of goods. NORTEC assumes no responsibility for any material shortages beyond
this period.
(3)
Inspect shipping boxes for damage and note damages on shipping waybill
accordingly.
(4)
After unpacking, inspect equipment for damage and if damage is found, notify the
shipper promptly.
(5)
All NORTEC products are shipped on an FOB factory basis. Any and all damage,
breakage or loss claims are to be made directly to the shipping company.
2. PACKAGING
A. GENERAL
(1)
The equipment packaging is standardized in that each box in the shipment will
always have the same contents. The following paragraphs identify the contents of
each box.
B. HUMIDIFIER AND CONTROLS BOX
(1)
The typical equipment found in the humidifier and controls box is shown in Figure
2. The contents of the box are listed on the box. If controls are ordered they will be
listed and small accessories that fit into the box will also be listed on the box.
C. DISTRIBUTOR BOX
(1)
Depending on the equipment ordered any of the following distributor box
configurations may be received:
a.
For equipment received if an ASD, BSD, CSD distributor(s) is ordered refer to
Figure 3.
b.
For equipment received if a SAM-e distributor is ordered refer to Figure 4.
c.
For equipment received if a RMBP is ordered refer to Figure 5.
D. ACCESSORIES
BOX
(1)
Additional accessories such as DWC, DWSP, Filter, and Fill cup extension kits are
shipped in a separate box. Smaller accessories that would fit in the humidifier box
are put in the humidifier box and the box is identified as containing such.