Unpacking the 703t server, Introduction – Nortel Networks CALLPILOT 555-7101-226 User Manual
Page 35
![background image](/manuals/193578/35/background.png)
November 2005
Preinstallation requirements
Part 2: 703t Server Hardware Installation
35
Unpacking the 703t server
Introduction
Follow this procedure to unpack the server and peripherals.
To unpack the equipment
1 Carefully open the cardboard carton containing the server.
2 Remove the server from the carton and set it on the floor.
3 Carefully open the cartons containing the monitor, keyboard, mouse,
modem, and ELAN hub (if supplied), and set the peripherals aside.
4 Put all manuals, CD-ROMs, operating system disks, any disks for
peripherals, and the Windows NT emergency repair disk in a safe place.
.
WARNING
Risk of personal injury
The 703t CallPilot server weighs approximately 22 kg (46 lb)
as shipped from manufacturing. If necessary, and to prevent
personal injury, ask someone to help you unpack and position
the server.
ATTENTION
As you unpack each item, check it off against the
packing list, as well as against the following checklists
provided in CallPilot Installation and Configuration
Part 1: Installation and Maintenance Overview (555-
7101-210):
“CallPilot software media and documentation
checklist”
“CallPilot server hardware checklist”