Installing the fp-rtd-124, Figure 1. installing the fp-rtd-124, Installing the cfp-rtd-124 – National Instruments cFP-RTD-124 User Manual
Page 2

FP-RTD-124 and cFP-RTD-124
2
ni.com
Installing the FP-RTD-124
The FP-RTD-124 mounts on a FieldPoint terminal base (FP-TB-x).
Hot plug-and-play enables you to install the FP-RTD-124 onto a
powered terminal base without disturbing the operation of other
modules or terminal bases. The FP-RTD-124 receives operating
power from the terminal base.
To install the FP-RTD-124, refer to Figure 1 and complete the
following steps:
1. Slide the terminal base key to either position X, used for any
module, or position 1, used for the FP-RTD-124 module.
2. Align the FP-RTD-124 alignment slots with the guide rails on
the terminal base.
3. Press firmly to seat the FP-RTD-124 on the terminal base.
When the module is firmly seated, the terminal base latch locks
it into place.
Figure 1. Installing the FP-RTD-124
Installing the cFP-RTD-124
The cFP-RTD-124
mounts on a Compact FieldPoint backplane
(cFP-BP-x). Hot plug-and-play enables you to install the
cFP-RTD-124 onto a powered backplane without disturbing the
operation of other modules or connector blocks. The cFP-RTD-124
receives operating power from the backplane.
Alignment
Slot
Key
Latch
Guide Rails
Terminal Base
I/O Module