Premier Mounts PP-FCMA-QL User Manual
Page 10

Page 10
Installation Instructions
PP-FCMA-QL
Ceiling Tile
PP-FCMA-QL
M8 Flat
Washer
M8 x 20mm
Phillips Head
Screw
PP-FCMA-QL Adjustments
Step 1. Loosen the M8 x 20mm screws and M8 flat washers. This will allow you to slide the base box laterally.
Please refer to the purchased base box for further operating instructions.
Electrical installation should be done in accordance to local codes and regulations.
Step 1. Cut the tile where the electrical base box is going to be secured.
Step 2. Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure
it to the plate.
Step 3. Make all electrical connections at this time.
Electrical Box Installation
Electrical Box
Cut-out
Electrical Box