beautypg.com

Premier Mounts PP-FCMA-QL User Manual

Page 10

background image

Page 10

Installation Instructions

PP-FCMA-QL

Ceiling Tile

PP-FCMA-QL

M8 Flat
Washer

M8 x 20mm
Phillips Head
Screw

PP-FCMA-QL Adjustments

Step 1. Loosen the M8 x 20mm screws and M8 flat washers. This will allow you to slide the base box laterally.

Please refer to the purchased base box for further operating instructions.

Electrical installation should be done in accordance to local codes and regulations.

Step 1. Cut the tile where the electrical base box is going to be secured.
Step 2. Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure

it to the plate.

Step 3. Make all electrical connections at this time.

Electrical Box Installation

Electrical Box
Cut-out

Electrical Box