Powerware 9125 User Manual
Page 23
INSTALLATION
EATON Powerware
®
9125 Two-in-One EBM (700–2000 VA) User’s Guide
S 05146489 Rev D www.powerware.com
19
5.
Plug the EBM cable(s) into the battery connector(s) as shown in
Figure 6. Up to four EBMs may be connected to the UPS.
6.
Follow the installation instructions in the Powerware 9125
Two-in-One UPS (700–2000 VA) User’s Guide for installing the UPS.
NOTE The batteries charge to 80% capacity in approximately 2 hours. However, it is
recommended that the batteries charge for 36 hours after installation or long-term storage.
NOTE If you installed power management software and EBMs, ensure maximum battery
runtime by using the ERM configurator tool on the Software Suite CD and connecting a
minimum load of 10% (15% recommended) to the UPS.
UPS Battery
Connector
EBM Battery
Connectors
EBM Cables
UPS
EBM
EBM
Figure 6. Tower EBM Connections (120V Model Shown)