Rack-mount installation – Powerware 9125 User Manual
Page 20
INSTALLATION
EATON Powerware
®
9125 Two-in-One EBM (700–2000 VA) User’s Guide
S 05146489 Rev D www.powerware.com
16
Rack-Mount Installation
The EBM can be installed in 19- or 23-inch racks and needs only 2U of
valuable rack space.
C A U T I O N
The EBM is heavy (29.5 kg/65 lb). A minimum of two people are required to lift the cabinet
into the rack.
NOTE Mounting rails are required for each UPS and EBM cabinet. If rails are not already
installed in your rack, contact your local distributor to order rail kits.
To install the EBM in a rack:
1.
Place the EBM on a flat, stable surface with the front of the EBM
facing toward you.
2.
Attach the supplied mounting handles to the mounting brackets and
secure with the supplied screws (see Figure 1).
3.
Align the mounting brackets with the screw holes on the sides of
the EBM and secure with the supplied screws (see Figure 1).
4.
If installing additional EBMs, repeat Steps 1 through 3 for each
cabinet.
Mounting
Handle
Mounting
Bracket
Figure 1. Installing the Mounting Handles and Brackets