beautypg.com

Chapter 2 installation, Inspecting the equipment, Ebm installation – Powerware 9125 User Manual

Page 19

background image

EATON Powerware

®

9125 Two-in-One EBM (700–2000 VA) User’s Guide

S 05146489 Rev D www.powerware.com

15

Chapter 2

Installation

NOTE If you are installing the UPS and the Extended Battery Module together, follow the
installation instructions in the UPS user’s guide.

This section explains:

S

Equipment inspection

S

UPS and Extended Battery Module setup

S

EBM installation

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.

NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.

EBM Installation

The Powerware 9125 EBM is designed for flexible configurations and
can be installed in a rack or as a standalone cabinet.

If you are installing the EBM in a rack, continue to the following section
“Rack-Mount Installation;” otherwise, continue to “Tower Installation”
on page 18.