Tower Installation

The UPS and EBMs must be stabilized with joining brackets.

1.

Carefully position the cabinets upright with the air vents at the top
(see Figure 4).

Air Vents

Figure 4. Tower UPS with EBMs

2.

Remove the adjacent corner screws from the rear panels as shown
in Figure 5 to install the joining brackets. Discard the screws.

3.

Align each joining bracket with the screw holes and secure with the
screws provided in the accessory kit.

4.

If installing additional EBMs, repeat Steps 2 and 3 for each cabinet.

Joining Bracket

Joining Bracket

EBM

UPS

Figure 5. Installing the Joining Brackets