Click, Installation instructions – Pitney Bowes DM200L User Manual
Page 8
DM200L - Installing DM200L
Page 8 of 11
Installation Instructions
SV61352 Rev. B
Install Moistener
Position the moistener on the left side of
the transport deck as shown.
The moistener will click into place.
Fill the moistener reservoir with Pitney
Bowes E-Z Seal sealing solution. You may
fill it later if you don't plan on moisten-
ing and sealing envelopes right now.
Position Stacker
Position the stacker next to the DM200L as
shown. The stacker provides a convenient
location to store your mail, tape sheets, and
operator guide.
Stacker
CLICK
!
Solution
Level