Post rack installation – Polycom PDS 725-78600-002A2 User Manual
Page 18
Polycom Digital Signage Server Getting Started Guide
Rack Installation
14
Polycom, Inc.
• Make sure the rack / rail assemblies and screws are aligned in the rack not
only in the front and back, but are level in height on the left and right sides
for proper alignment for appliance installation.
Step 3
• Align the fixed chassis rails on the appliance with the fixed rack rail
brackets installed in the rack.
• Carefully slide the appliance into the rack until you hear the locking tabs
on each side of the fixed front rails click into place.
• Push the appliance all the way into the rack until it stops.
• Sefcure the unit in the rack using a 10-32 x 3/4" truss head screw (and a
cage nut if not already installed) in the center hole on each rail.
2-Post Rack Installation
Unpack the appliance and locate the mounting hardware.
Two M5 x 12
flat head screws and
two cone washers
(rear)
Two cage nuts
(rear)
4-post rack
Three cage nuts
(front)
Two M5 x 12
flat head screws
and two cone
washers
Outer fixed chassis rails