Figure 8, Step 8 – ParaBody Hip Sled System User Manual
Page 12
FIGURE 8
STEP 8:
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
12
• Remove the two temporary 1/2 X 4-1/2” BOLTS (43) from STEP 5.
• Swing the LEFT (8) and RIGHT (9) RAILS out enough to insert the CARRIAGE ASSEMBLY (16) in between them. Allow the
CARRIAGE (16) to rest on the SAFETY STOPS underneath the RAILS. See FIGURE 8.
43 1/2 X 4-1/2”
16
8
9
SAFTEY
STOP
See also other documents in the category ParaBody Sports and recreation:
- Free Weight Systems (5 pages)
- 886101 (3 pages)
- 425/660 (2 pages)
- 822 (9 pages)
- 848101 (14 pages)
- 881 (26 pages)
- Free Weight Smith System (5 pages)
- Leg Press 100101 (14 pages)
- 360101 (11 pages)
- 777 (5 pages)
- 832102 (14 pages)
- Leg Press 100 (11 pages)
- 205101 (1 page)
- 425 (2 pages)
- 440 (33 pages)
- 426103 (45 pages)
- 824 (8 pages)
- 425103 (40 pages)
- GS2 (24 pages)
- 826 (8 pages)
- 856 (6 pages)
- 400101 (27 pages)
- 829 (14 pages)
- 435104 (13 pages)
- GS6 (8 pages)
- 842 (6 pages)
- 778 (13 pages)
- 375101 (22 pages)
- Leg Press 5 (15 pages)
- 838 (10 pages)
- 441101 440 (10 pages)
- LP5 (15 pages)
- Home Guide (9 pages)
- 888 (15 pages)
- cm3 (8 pages)
- 870 (4 pages)
- 893103 (20 pages)
- 890 (10 pages)
- 250101 (18 pages)
- 843 (12 pages)
- GS4 (1 page)
- 849 (7 pages)
- 855 AB (9 pages)
- 883 (31 pages)