Bank 2 – Perle Systems MEDIA CONVERTERS S-1110DPP User Manual
Page 15
Perle PoE/PoE+ Ethernet Media Converter
Installation Guide
15
Bank 2
PSE Enable Copper-1 (Switch 1, 2)
PSE Enable Copper-2 (Switch 4, 5) (dual
copper models only)
Switch Position 1, 4
Switch Position 2, 5
Type
Up (default)
Up (default)
PSE enabled
normal detection
Up
Down
PSE enabled
High capacitance
detection
Down
Up
PSE enabled
Legacy device
detection
Down
Down
PSE disabled
These switches must be set in order to enable the power sourcing
function and to indicate the type of device detection required. If the
device type is unknown, the default should be used as per
IEEE802.3af/at standards.
Enabled: When enabled, the media converter will perform Power
Sourcing Equipment (PSE) functions as per IEEE802.3af (POE) or
802.3at-2009 (POE+) standards.
Disabled: When disabled the media converter will not perform
PSE functions.
PD Power Reset 1 (Switch 3)
PD Power Reset 2 (Switch 6) (dual copper
models only)
Switch Position
Mode
Up (default)
Disabled
Down
Enabled
Disabled: When disabled, the loss of fiber link has no effect on
PSE power to the PD device.
Enabled: When enabled, if the media converter detects loss of link
on any fiber port it will turn off PSE output power to the PD device