beautypg.com

Baxi Potterton ECOGEN 24/1.0 User Manual

Page 2

background image

2

© Baxi Heating UK Ltd 2010

Natural Gas

Baxi Ecogen 24
G.C.N

o

41 075 60

© Baxi Heating UK Ltd 2010 All rights reserved. No part of this publication may
be reproduced or transmitted in any form or by any means, or stored in any
retrieval system of any nature (including in any database), in each case whether
electronic, mechanical, recording or otherwise, without the prior written
permission of the copyright owner, except for permitted fair dealing under
Copyrights, Designs and Patents Act 1988.

Applications for the copyright owner’s permission to reproduce or make other
use of any part of this publication should be made, giving details of the proposed
use, to the following address:

The Company Secretary, Baxi Heating UK Ltd, The Wyvern Business Park,
Stanier Way, Derby, DE21 6BF.

Full acknowledgement of author and source must be given.

WARNING: Any person who does any unauthorised act in relation to a
copyright work may be liable to criminal prosecution and civil claims for damages.

1.0

Quick Reference Guide

3

2.0

Introduction

4

3.0

The Programmers

5

4.0

Setting the Time

6

5.0

Setting the Central Heating Times

7

6.0

Setting the DHW Times

9

7.0

Mode Selection/Temp Adjustment

11

8.0

Contents of Other Functions

14

9.0

Resetting the Boiler

16

10.0

Clearance

17

11.0

Error Codes

18

12.0

Care of the boiler

20

13.0

Legislation

21

14.0

Notes

22

Section

Page

Contents

Boiler Controls - see opposite page

for Operating Quick Reference Guide

This appliance contains a pressure vessel filled with Helium to 23 bar.

Do not strike, drop, drill or puncture the vessel.

Do not unbolt any of the covers or flanges.

The vessel contains no user serviceable parts.

Dispose of safely.

0086

The Benchmark Scheme

Baxi Heating UK Ltd is a licensed member of the Benchmark Scheme which aims
to improve the standards of installation and commissioning of domestic heating
and hot water systems in the UK and to encourage regular servicing to optimise
safety, efficiency and performance.

Benchmark is managed and promoted by the Heating and Hotwater Industry
Council. For more information visit www.centralheating.co.uk

Legionella

If the DHW cylinder has been fitted with a control sensor instead of a thermostat

for increased efficiency, the control will recognise this and automatically initiate an

anti-legionella function. In this case the user should be aware that once a week the

DHW set point is overridden and the cylinder is heated to 65° C for 10 minutes.

The default time for this action is monday 8am every week.

If the set point has been reduced to say 40° C for safety reasons, the users must

bear in mind that the temperature around this time may be much hotter than usual.

The time of the function may be altered or the action disabled.

This appliance contains a small scale embedded generator (SSEG).

Both the District Network Operator and the Electricity Provider

must be informed, this is a legal requirement - see section 12.3.