Determine boiler location, Installation & operation manual – Lochinvar Commercial Soiler 400-801 User Manual

Page 9

background image

9

1

Determine boiler location

(continued)

ALCOVE INSTALLATION

OPEN
FRONT

1/4" (6 MM) MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1” (25 MM) MINIMUM CLEARANCE
AROUND VENT PIPE

18" (457 MM)
FRONT

0"

RIGHT

13" (330)
TOP

12"
(305 MM)
LEFT

14" (356 MM)
REAR

RECOMMENDED SERVICE CLEARANCES:

FRONT

- 30” (762 mm)

TOP

- 24” (610 mm)

LEFT SIDE - 24” (610 mm)
REAR

- 24” (610 mm)

Figure 1-2 Alcove Installation - Minimum Required Clearances

CLOSET INSTALLATION

CLOSED DOOR

VENTILATING
AIR OPENING

*

*

*

AREA OF EACH OPENING:

1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES.

1/4" (6 MM) MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1” (25 MM) MINIMUM CLEARANCE
AROUND VENT PIPE

6" (152 MM)
FRONT

6"

13"
TOP

0"
RIGHT

12"
(305 MM)
LEFT

14" (356 MM)
REAR

VENTILATING
AIR OPENING

RECOMMENDED SERVICE CLEARANCES:

FRONT

- 30” (762 mm)

TOP

- 24” (610 mm)

LEFT SIDE - 24” (610 mm)
REAR

- 24” (610 mm)

Figure 1-1 Closet Installation - Minimum Required Clearances

ƽ WARNING

ƽ WARNING

Installation & Operation Manual

For alcove installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
an alcove structure due to elevated
temperatures. Failure to follow
this warning could result in fi re,
personal injury, or death.

For closet installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
a closet structure due to elevated
temperatures. Failure to follow
this warning could result in fi re,
personal injury, or death.