beautypg.com

Sidewall direct venting, Multiple vent/air terminations, Installation & operation manual – Lochinvar Commercial Soiler 400-801 User Manual

Page 26

background image

26

4

Sidewall direct venting

SIDEWALL

TERMINATION PLATE

VENT

PIPING

GALVANIZED
THIMBLE

(WHEN REQUIRED BY LOCAL CODES)

ELBOW

ELBOW

AIR PIPING

BIRD SCREEN

BIRD SCREEN

Figure 4-5C A Typical Sidewall Termination Assembly - Models
400 - 801 PVC/CPVC/ Polypropylene or Stainless Steel

All vent pipes and air inlets must terminate
at the same height to avoid possibility of
severe personal injury, death, or substantial
property damage.

Multiple vent/air terminations

1. When terminating multiple Knight XL’s terminate

each vent/air connection as described in this manual
(FIG. 4-6A).

2. Place wall penetrations to obtain minimum clearance of

12 inches (305 mm) between vent pipe and adjacent air
inlet elbow, as shown in FIG. 4-6A for U.S. installations.
For Canadian installations, provide clearances required
by CSA B149.1 Installation Code.

3. The air inlet of a Knight XL is part of a direct vent

connection. It is not classifi ed as a forced air intake with
regard to spacing from adjacent boiler vents.

VENT

12” (305 MM) MIN
15” (381 MM) MAX

12” (305 MM) MIN. BETWEEN EDGE
OF AIR PIPE AND ADJACENT VENT
PIPE

AIR

Figure 4-6B Alternate Multiple Vent Terminations
w/Field Supplied Fittings (must also comply with

Figure 4-1B)

ƽ WARNING

Prepare wall penetrations (Alternate - Field

Supplied Option)

1. Air pipe penetration:

a. Cut a hole for the air pipe. Size the air pipe hole as

close as desired to the air pipe outside diameter.

2. Vent

pipe

penetration:

a. Cut a hole for the vent pipe. For either combustible

or noncombustible construction, size the vent pipe

hole with at least a 1/2 inch clearance around the vent

pipe outer diameter:

• 5½ inch hole (140 mm) hole for 4 inch (102 mm)

vent pipe

• 7½ inch hole (191 mm) hole for 6 inch (152 mm)
vent pipe
b. Insert a galvanized metal thimble in the vent pipe

hole as shown in FIG. 4-5C.

3. Use a sidewall termination plate as a template for correct

location of hole centers.

4. Follow all local codes for isolation of vent pipe when passing

through fl oors or walls.

5. Seal exterior openings thoroughly with exterior caulk.

12" MIN. BETWEEN EDGE OF AIR

INLET AND ADJACENT VENT OUTLET

VENT / AIR

TERMINATION

VENT

AIR

Figure 4-6A Multiple Vent Terminations (must also
comply with Figure 4-1A)

Installation & Operation Manual

SIDEWALL
ADAPTER
(AIR)

SIDEWALL
ADAPTER
(VENT)

WALL
PLATE

GALVANIZED
THIMBLE

SIDEWALL
RETAINING
PLATE

VENT
PLATE

VENT
CAP

IMG00085

Figure 4-5B Polypropylene Sidewall Termination Assembly