5 - mounting the switchplate, 5 mounting the switchplate – KVH Industries TracVision 4 User Manual
Page 29
2.5
Mounting the Switchplate
After completing the switchplate wiring process, you must install
the switchplate itself. This process, detailed in the following
steps, is illustrated in Figure 2-16.
1. Fit the switchplate assembly and support frame
into the panel cutout made earlier and flush to the
mounting surface.
2. Drill out four
5
⁄
32
" (4 mm) holes in the countersunk
settings in the switchplate support frame.
3. Drill four
3
⁄
32
" (2.5 mm) holes in the mounting
surface using the countersunk holes in the support
frame as the template. Secure the support frame
and switchplate assembly to the mounting surface
using the four #6 self-cutting screws.
4. Snap the front cover into place to cover the screws
and support frame.
5. Reconnect vessel power.
Installation
54-0150
25
3.82"
(97 mm)
2.36"
(60 mm) 2.05"
(52 mm)
3.19"
(81 mm)
A. Panel Cutout
B. Support Frame
C. Front Cover
5
/
32
" (4 mm)
3
/
32
" (2.5 mm)
Figure 2-16
Mounting the Switchplate
Support Frame and Front Cover
Before securing the switchplate to
the mounting surface, be sure to
strain relieve the wires connecting
to the switchplate connectors.
Several tie-wraps have been
provided to aid in strain relieving
the wires.