Commissioning, Switching-up, Switching-off – Kathrein MSK 25 User Manual
Page 14

Commissioning
14
Commissioning
Switching-Up
• Connect the instrument to the mains with the wall power supply.
• Turn the on/off switch to the right.
• Adjust the desired volume.
The LC display will then indicate the particular software version for appr.
1 second.
Thereafter the LC display will indicate the loading capacity of the battery
for appr. 3 seconds.
One segment comes up to appr. 20% of the overall capacity (3.4 Ah).
Now, feed in the reception signal of the receiving installation in the RF
input socket.
LC display:
• channel
• mode
• level (A = analogue level measurement; D = digital level
measurement)
Select the desired mode by pressing [TV/SAT]
Switching-Off
Turn the on/off switch counter-clockwise.
Software V2.0
SN: 000222
ACCU [−−−−−]
CH: .02.
TV
LEV: 48.5dBuV A
- UFC 861si (128 pages)
- UFS 790si (80 pages)
- UFD 545 (65 pages)
- UAS 584 (8 pages)
- UFD 420 (35 pages)
- UFS 822si (156 pages)
- UFD 574/S (64 pages)
- MobiSet 2 CAP 210 (36 pages)
- MFK 16 (16 pages)
- UFD 570/S (64 pages)
- UFS 650si (76 pages)
- UFS 705sw (88 pages)
- UFD 346 (34 pages)
- UFE 371/S (36 pages)
- UFE 371/S (2 pages)
- UFD 540 (80 pages)
- UFS 922 sw (184 pages)
- UFS 910 (16 pages)
- UFD 345 (34 pages)
- Twin-PVR Satellite UFS 821sw (128 pages)
- Euroline UFE 370/S (36 pages)
- UFS 640si (80 pages)
- UFD 231 (27 pages)
- UFD 515 (57 pages)
- 9986492 (116 pages)
- UFD 520 (60 pages)
- UFS 902 (88 pages)
- UFS 700si (88 pages)
- UFD 170 (80 pages)
- MSK 125 (80 pages)
- MSK 24 (56 pages)
- UFC 762sw (52 pages)
- UFS 740sw (88 pages)
- DISEQC EXR 24 (4 pages)
- UFS 733sw (76 pages)
- UFS 702si (68 pages)
- UFS 712si (72 pages)
- Euroline UFE 305/S (36 pages)
- UFD 400 (34 pages)
- UFS 710sw (88 pages)
- MobiSet 2 Digital CAP 600 (60 pages)
- UFD 430 (39 pages)
- MSK 200/S2 (24 pages)
- UNIVERSAL FEED SYSTEMS UAS 177 (6 pages)