beautypg.com

3 - antenna gyro assembly, Section 5.4.3, 3 antenna gyro assembly – KVH Industries TracVision C3 User Manual

Page 63

background image

5-7

Maintenance

54-0159 Rev. G

5. Remove the 4 standoffs

Fig. 5-1

. Remove the RF

Detector PCB from the rotating plate.

6. Installation of the replacement RF Detector is the

reverse of this procedure. Be sure that the RF
cables are restored to their original positions. Be
sure that the center conductor pin is centered in
the connector before tightening the collar.

5.4.3 Antenna Gyro Assembly

Estimated Time to Repair: 1 hour

The antenna gyro is mounted on the rear of the antenna reflector
bracket with four locking nuts and washers

Fig. 5-3

. Following

the removal and replacement of the antenna gyro assembly, it
will be necessary to calibrate the gyro and restart the system.
Directions for removal, replacement, and calibration follow:

1. Using needle-nose pliers, remove the E-ring from

one end of the connecting rod

Fig. 5-2

.

2. Remove the connecting rod by sliding it off the

bracket.

3. Fully retract the elevation axis motor shaft

Fig. 5-5

.

4. Remove the 6 pan head screws from the PCB cover

flanges.

5. Remove the PCB cover. To get the necessary

clearance, rotate the linear actuator up 90º while
lifting the PCB cover

Fig. 5-5

.

6. Remove the screw and clamp holding the antenna

gyro cable to the rotating plate. Be sure to save the
cable clamp and screw

Fig. 5-4

.

7. Remove the Molex connector from J11 on the PCB

Fig. 5-6

.

8. Remove the 4 nuts and washers and take the gyro

off of the bracket.

9. Remove the antenna gyro gasket.

10. Replacement is the reverse of this procedure.

Following the removal and
replacement of the antenna gyro
assembly, it will be necessary to
calibrate the gyro and restart
the system as described in the next
section.