beautypg.com

Gap installation – Southbend SB1046PF User Manual

Page 89

background image

For Machines Mfg. Since 3/11

Turn-Nado

®

Gearhead Lathes

-87-

S E R V I C E

5. Install all fasteners and lightly snug them in

place.

6. Mount a dial indicator with a magnetic base

to the top of the saddle to indicate alignment.

7. First test the peak of the two prisms of the

gap insert that the saddle rides on, then test

the flanks of the prisms.

8. Tighten the gap bed cap screws in an

alternating manner and tap the side of the

gap insert into alignment.

9. Inspect the gap alignment 24 hours later

to make sure the gap is still aligned. If

necessary, loosen the gap bed cap screws and

repeat Steps 7–8 until the insert is properly

aligned.

Gap Installation

1. Use mineral spirits and a clean lint-free rag

to clean the mating surfaces of the gap, bed,

and ways. If necessary, stone the mating

surfaces to remove scratches, dings, or burrs.

2. Wipe a thin layer of light machine oil on the

mating surfaces.

3. Place the gap insert into the gap and use a

dead-blow hammer to align the insert with

the lathe bed.

4. Back off the dowel pin jack nuts, and lightly

tap the dowel pins back into their respective

holes until they are seated. This process will

further help align the gap insert and bed

mating surfaces.