PREPARATION

For Machines Mfg. Since 3/11

Turn-Nado

®

EVS Lathes

-21-

P R E P A R A T I O N

Preparation Overview

Things You'll Need

To complete the preparation process, you will
need the following items:

For Lifting and Moving
s

!

s

,IFTING

s

'UIDE

s

Two other people for assistance when moving
machine

s

Hardwood blocking (see Page 27)

For Power Connection
s

A power source that meets the minimum
circuit requirements for this machine (review
the Power Supply Requirements section
on the next page for details)

s

An electrician or qualified service personnel
to ensure a safe and code-compliant
connection to the power source

For Cleaning & Assembly
s

Cotton rags

s

Mineral spirits

s

Quality metal protectant oil

s

3AFETY

s

Wrench or socket 21mm

s

Wrench or socket 19mm

s

&LOOR

s

0RECISION

s

Standard screwdriver #2

The purpose of the preparation section is to help
you prepare your machine for operation. The list
below outlines this basic process. Specific steps
for each of these points will be covered in detail
later in this section.

The typical preparation process is as follows:

1.

Unpack the lathe and inventory the contents

of the box/crate.

2.

Clean the lathe and its components.

3.

Identify an acceptable location for the lathe

and move it to that location.

4.

Level the lathe and either bolt it to the floor

or place it on mounts.

5.

Assemble the loose components and make

any necessary adjustments or inspections to
ensure the lathe is ready for operation.

6.

Check/lubricate the lathe.

7.

Connect the lathe to the power source.

8.

Test run the lathe to make sure it functions

properly.

9. Perform the spindle break-in procedure to

prepare the lathe for operation.