beautypg.com

Site preparation, Before you start – Sub-Zero Undercounter Refrigeration UC-24CI4 User Manual

Page 5

background image

Site Preparation

5

subzero.com/specs

Before You Start

Make sure the opening dimensions, door clearance,

electrical service and plumbing are correct for the model

you are about to install. Refer to specifications on the

following pages.

IMPORTANT NOTE:

To operate properly, the door must

open a minimum of 90°. Use a minimum 3"

(76)

filler in

corner installations to assure a 90° door opening. Allow

enough clearance in front of the unit for full door swing.

TOOLS AND MATERIALS REQUIRED

Appliance dolly able to support 130 lbs

(59 kg)

Level — 2'

(.6 m)

and 4'

(1.2 m)

recommended

Phillips and slotted screwdriver sets

Wrench set and allen wrench set

Crescent wrenches

Various sized pliers

5

/

16

" hex bolt nut driver

Drill and assorted drill bits

Model UC-24CI—4'

(1.2 m)

of

1

/

4

" copper, braided

stainless steel or PEX tubing and saddle valve for

water line (do not use self-piercing valves).

Model UC-24CI—Tubing cutter.

Masonite, plywood,

1

/

8

" pressed fiberboard, cardboard

or other suitable material to protect finished flooring