beautypg.com

Sub-Zero Undercounter Refrigeration UC-24CI4 User Manual

Page 13

background image

Undercounter Installation

13

subzero.com/specs

Installation Checklist

To ensure a safe and proper installation, the following

checklist should be completed by the installer to ensure

that no part of the installation has been overlooked.

Has all packing material been removed?

Turn the unit on. Is it operating properly? If not, is the

unit plugged in? Is the control turned on?

Is the power cord plugged into a properly grounded

3-prong outlet, which has been installed in accordance

with all applicable electrical codes?

Has the unit been secured in place with the anti-tip

bracket?

Is the unit level? Are all leveling legs making contact

with the floor?

Is the kickplate installed properly?

Is the water supply connected (model UC-24CI)?

Have you checked for leaks?

Is the door panel attached securely and properly

aligned?

Is the door aligned for proper appearance and

operation?

Have any installation or service problems been noted

on the product registration card? Has the registration

card been mailed in?

Has the stainless steel door or panel been inspected

for any imperfections? This is to be done by the dealer

or installer with the customer upon completion of the

installation. Stainless steel panels are covered by a

limited 60-day parts and labor warranty for cosmetic

defects.