beautypg.com

Chapter 3 installing the switch, Selecting a site, Installing the switch -1 – SMC Networks 10G User Manual

Page 37: Selecting a site -1, Hapter, Nstalling, Witch

background image

3-1

C

HAPTER

3

I

NSTALLING

THE

S

WITCH

Selecting a Site

TigerSwitch 10G units can be mounted in a standard 19-inch equipment
rack or on a flat surface. Be sure to follow the guidelines below when
choosing a location.

• The site should:

- be at the center of all the devices you want to link and near a power

outlet.

- be able to maintain its temperature within 0 to 50 °C (32 to 122 °F) and

its humidity within 5% to 95%, non-condensing

- provide adequate space (approximately two inches) on all sides for

proper air flow

- be accessible for installing, cabling and maintaining the devices
- allow the status LEDs to be clearly visible

• Make sure twisted-pair cable is always routed away from power lines,

fluorescent lighting fixtures and other sources of electrical interference,
such as radios and transmitters.

• Make sure that the unit is connected to a separate grounded power outlet

that provides 100 to 240 VAC, 50 to 60 Hz, is within 2 m (6.6 feet) of
each device and is powered from an independent circuit breaker. As with
any equipment, using a filter or surge suppressor is recommended.