beautypg.com

Installing the switch, Equipment checklist, Selecting a site – SMC Networks 24/16 User Manual

Page 18: Equipment checklist selecting a site, Nstalling, Witch

background image

I

NSTALLING

THE

S

WITCH

7

I

NSTALLING

THE

S

WITCH

The EZ Switch 10/100 can be placed on a desktop or shelf, or
installed in a standard 19-inch equipment rack.

Equipment Checklist

After unpacking the EZ Switch 10/100, check the contents of the
box to be sure you have received the following components:

EZ Switch 10/100 SMC-EZ1024FDT or SMC-EZ1016FDT

Appropriate AC power cable

Rackmount kit

Four adhesive foot pads

SMC Warranty Registration Card

This User Guide

Selecting a Site

Be sure to follow the site selection guidelines below when
choosing a location:

Select a suitable location for the switch:

It should be accessible for installing, cabling and
maintaining the switch.

The temperature and humidity should be within the ranges
listed in the specifications.

The status LEDs should be clearly visible.

There should be adequate space (approximately two
inches) on all sides for proper air flow.