3 preparing the library, Unpacking the library, Chapter 3. preparing the library – Spectra Logic 10000 User Manual
Page 25

25
3 Preparing the Library
Preparing the library includes the following, which are outlined in this chapter:
• Selecting an Appropriate Environment for the Library
• Selecting the Mode of Library Operation
• Setting the Library Configuration Switch
• Connecting the SCSI Cables and Terminators
• Connecting the Library to Fibre Channel
Unpacking the Library
The Spectra 10000 library is shipped with the following items:
• Spectra 10000 Library Release Notes
• Spectra 10000 Library User Guide (this guide)
• One Spectra Logic screwdriver
• One AC power cord
• Two SCSI terminators (for SCSI libraries only)
• One front panel filter element
Note:
Keep the library’s shipping carton and foam inserts. If the library
needs to be shipped for any reason, it must be packaged in its
original box and packing material for the warranty to remain valid.
See Packing the Library for Shipment on page 89 for information
on the correct way to repackage the library.
See the Spectra Logic Repair Policy on page 106
for information on
returning a library for service.