beautypg.com

Atu harness connection locations – John Deere AUTOTRAC UNIVERSAL STEERING KIT PC20577 User Manual

Page 14

background image

Installation Instructions

OUO6050,0001477

–19–20OCT05–1/1

ATU Harness Connection Locations

Depending on your vehicle’s configuration, refer to
one of the following sections for additional harness
connection information.

Harness connection location in GreenStar Ready tractor
side consoles

Harness connection location for implement connectors

Harness connection location to a terminator connector
on a GreenStar Harness

OUO6050,0001291

–19–20OCT05–1/6

Harness Connection location in GreenStar
Ready Tractor Side Consoles

PC8731

–UN–30AUG05

A—Screw
B—Spacer
C—Panel
D—Panel

1. Remove and retain screw (A) and spacer (B).

2. Remove and disconnect panels (C and D).

Continued on next page

PC20577 (22MAR06)

12

Installation Instructions

032206

PN=14