Locate the hose at the foot end of the mattress, Perform one of the following, Connector cover – Invacare MA90Z User Manual
Page 17: 4 operation
4 OPERATION
17
1.
Locate the hose at the foot end of the mattress.
2.
Locate the control unit connector on the right side of the control unit.
3.
Perform one of the following:
•
MA90Z Power Unit - Perform the following steps (Detail “A”):
i.
Squeeze and hold the tabs on the hose connectors.
ii.
Insert the hose connectors into the control unit connector.
iii. Push the hose connectors onto the control connector until an audible click is heard.
•
MA95Z Power Unit - Perform the following steps (Detail “B”):
i.
Lift and hold the connector cover up.
ii.
Push the hose connector onto the control connector.
iii. Ensure the hose connector is flush with the control unit connector.
FIGURE 3 Connecting the Hose
The audible click indicates that the hose connector(s) are properly engaged with the control connectors.
Connector
Cover
Control Unit
Connectors
MA95Z, MA95ZB42 and
MA95ZB48 Hose
Connector
DETAIL “A” - MA90Z
CONNECTOR
Control Unit
DETAIL “B” - MA95Z CONNECTOR
MA90Z,
MA90ZB42
and
MA90ZB48
Hose
Connector
Tab