System setting procedure, 1 system setting screen, 2 system setting procedure – MITSUBISHI ELECTRIC TG-2000A User Manual
Page 25
22
8.1 System Setting Screen
The following is an explanation of the items found in the System Settings window.
Function group
Function
Operation details
User set- up
A l l o w o r d i s a l l o w c e r t a i n f u n c t i o n s
Site name set- up
Set the building name
[User Set- up group]
P a s s w o r d s e t - up
T h e p a s s w o r d c a n b e c h a n g e d
G- 50A connection set-up Sets the number of G-50A units connected and the IP address.
System configuration set-up Sets the system configuration, group, interlocking unit, etc.
Monitoring s c r e e n set-up Executes the model name setting, plane drawing creation, group icon
arrangement, etc.
Watt hour meter set- up
Set the watt hour meter serial port and watt hour meter address
Energy monitoring set-up
Set the system billing function
[System Set-up group]
Time set- up
Set the current time
Maintenance of charge data Proportional billing information can be r e v i s e d .
Operation amount data
monitor
Operation amount data stored in G-50A can be monitored and saved.
[Maintenance group]
Remedial apportioning
setting
Remedial apportioning can be tentatively performed when charging
trouble o c c u r s .
Displays the operation contents of the select buttons on each setting screen.
Buttons
Operation contents
[OK]
Validates the contents set on this display screen to advance to the next setting screen.
( A d v a n c e s t o t h e n e x t s e t t i n g s c r e e n i f i t i s t h e p r e p a r a t i o n s c r e e n . )
[Next]
A d v a n c e s t o t h e n e x t s e t t i n g s c r e e n .
[Back]
Invalidates the contents set on this display screen to return to the last screen.
[ C a n c e l ]
Invalidates the contents set on this display screen to shift to the initial screen.
8.2 System Setting Procedure
The following is an explanation of the System Settings
performed at the Initial window.
When no System Settings exist
User set-up Site name set -up G-50A connection set-up
System configuration set-up Monitoring screen set-up
Watt hour meter set-up Energy monitoring set-up
(Password set-up Time set-up)
Note:
• See Chapter 9 for the maintenance group items.
• The set items that are displayed depend on the functions of the TG -2000A purchased.
8. System Setting Procedure
Initial window
User Set-up
group
Maintenance group
System Set-up
group