MITSUBISHI ELECTRIC TG-2000A User Manual
Page 11
8
4.5 Step 3: Test operation from integrated centralized control software TG-2000A
Perform the test operation from the integrated centralized control software TG-2000A to check the
operation state and monitor display of the air conditioner.
For the operation procedure, refer to the Instruction Manual (Management).
Note:
• For confirmation in the test operation, use the checklist shown in Chapter 11.
• Perform the normal operation from the integrated centralized control software TG -2000A to
execute the test operation/confirmation. (The test operation function is not included in the
start/stop function.)