For existing construction – M&S Systems WG150W User Manual
Page 16

Page 16
for Existing Construction
Ceiling Speakers
For existing construction, the use of mounting 
rings can not occur. The following steps outline 
how to locate a section between two joists, mark 
the outer boundaries of the hole, drill a small hole 
in the center to verify the location and then cut 
the main hole. 
 
Step 1. Determine the location of the joists so the 
speaker can be centered approximately between 
them. There are several ways to go about this: 
•
Use an electronic stud finder. Many finders 
can also indicate the location of live AC 
wiring. 
•
Tap on the wall and listen to the resulting 
sound. When the sound is deeper and more 
hollow sounding, you are between joists. 
When the sound is sharper and more flat 
sounding, you are close or over a stud. 
•
Identify joists by the position of electrical 
light fixtures. There may be a joist directly to 
the left or right of these electrical fixture. This 
gives you a point of measurement since joists 
are either 24 or 16 inches on center in newer 
houses, 12 inches in older homes. 
 
Step 2. When you are sure of where the ceiling’s 
joists are (and are completely sure there isn’t an 
electrical cable, water pipe or heating duct in that 
vicinity of the wall), position the cardboard 
mounting template, and draw around the outer 
perimeter with a pencil. 
 
Step 3. Drill a 1-inch hole in the center of the 
pencil outline which you have just drawn, just 
115986D.pdf 16
115986D.pdf 16
11/16/2005 10:54:36 AM
11/16/2005 10:54:36 AM
