Installation warning – Grindmaster SHUTTLE BREWER APBVSA-430V2E230 User Manual
Page 4
Page 4
Shuttle Brewers & Airpot/Shuttle Brewers
Installation
WARNING
ELECTRIC SHOCK HAZARD!
Installation of this appliance should be performed by qualified service personnel only. Improper
installation could result in electrocution.
Set-Up/Position
1) Remove the brewer from the packing material and attach its legs.
2) Position the brewer on a strong, stable table or counter. Check the level front to back and side to side. Adjust the
legs to the correct level.
IMPORTANT:
THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE FOR ENSURING THAT ELECTRIC AND WATER
CONNECTIONS MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE, NATIONAL PLUMBING
CODE, AND ANY LOCAL ORDINANCES.
The electric and water hook-up locations are behind the front panel. Remove the four screws fastening this panel for
access to these connections.
Water Hook-up
1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.
2) Use 3/8” copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection
to the fill valve is 3/8” flare.
3) Water line pressure must be from 30 to 80 psi (207-2 KPA).
4) Hot (up to 160°F/71°C) or cold water may be used. Hot water offers faster recovery between brews.
5) Install a shut-off valve near the brewer.
6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water
has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting
type if cold water is used.
ƽ
- SHUTTLE BREWER APBIC-330V2E230 SHUTTLE BREWER APBIC-430V2 SHUTTLE BREWER APBVSA-330V2 SHUTTLE BREWER APB-430V2 SHUTTLE BREWER APB-330V2 SHUTTLE BREWER APB-430V2E230 SHUTTLE BREWER APBIC-330V2 SHUTTLE BREWER APBIC-430V2E230 SHUTTLE BREWER APBVSA-430V2 SHUTTLE BREWER APBVSA-330V2E230 SHUTTLE BREWER APB-330V2E230