beautypg.com

Gold's Gym XRT 75 GGSY69320 User Manual

Page 19

background image

19

46. Route the Leg Lever Cable (75) under a 115mm

Pulley (119). Attach the Pulley and a Large Cable
Trap (121) to the indicated side of the Butterfly
Upright (3) with an M10 x 95mm Bolt (92), an
M10 Washer (91), and an M10 Nylon Locknut
(87). Make sure that the Large Cable Trap is
turned to hold the Cable in the groove of the
Pulley.

48. Attach the end of the Leg Lever Cable (75) to the

“U”-bracket (59) with an M8 Washer (90) and an
M8 Nylon Locknut (71). Do not completely tight-
en the Locknut; it should be tightened so that
only two threads of the Cable show past the
Locknut, as shown in the inset drawing.

49. Locate the Squat Low Cable (72). Route the

threaded end of the Cable through the cage on
the Long Base (120) and hole in the Squat
Upright (4).

Attach a 90mm Pulley (78) inside the bracket on
the Long Base (120) with an M10 x 45mm Bolt
(93) and an M10 Nylon Locknut (87). Make sure
the Pulley is over the Squat Low Cable (72).

50. Route the Squat Low Cable (72) though the indi-

cated bracket on the Long Base (120) and under
a 90mm Pulley (78). Attach the Pulley to the Long
Base with an M10 x 45mm Bolt (93) and an M10
Nylon Locknut (87).

47. Wrap the Leg Lever Cable (75) over a 90mm

Pulley (78). Attach the Pulley to the Double “U”-
bracket (62) with an M10 x 45mm Bolt (93) and
an M10 Nylon Locknut (87).

46

47

48

49

50

121

75

75

72

72

87

87

78

93

75

75

92

119

3

4

91

87

93

59

71

71

90

93

120

120

62

87

78

78