beautypg.com

Assembly – Grizzly G0710 User Manual

Page 17

background image

Model g0710/g0710p (Mfg. since 11/11)

-15-

assembly

— if mounting to a wood framed wall (with

or without drywall), the bracket must be
mounted directly to a support board that
is wide enough to span and mount onto
two wall studs. Mount the support to the
wall studs with lag screws, then mount the
bracket to the support with appropriate fas-
teners, as shown in

figure 10.

For adequate motor cooling, the motor fan intake
must not be restricted by a wall or cabinet.

to assemble and mount the dust collector:

1. Fasten the motor bracket to the motor base

with the four included flange bolts, and install
the adhesive foam strip on the dust collector
outlet port at the location shown in

figure 8.

figure 9. Wall mounting bracket positioning.

LVaa

LVaa

;addg

Note:Drawing
Not to Scale.

)

&

$

'

B^c^bjb

)'

B^c^bjb

2. using the wall mounting bracket as a tem-

plate, mark the mounting hole location so
the bottom of the mounting bracket is a mini-
umum of 42" from the floor and at least 4

1

2

"

away from any wall, as shown in

figure 9.

LVaa
Bdjci^c\
7gVX`Zi

Bdidg7gVX`Zi

;aVc\Z7dai

6Y]Zh^kZ;dVbHig^e

7V\8aVbe

figure 8. dust collector assembly diagram.

LVaaHijY

Hjeedgi
7dVgY

LVaa

Bdjci^c\

7gVX`Zi

AV\7dai

figure 10. Mounting bracket secured to support

board on wall studs.

3. after the mounting bracket is installed on the

wall, have another person help you hang the
dust collector on the bracket.

4. install the dust collection bag with the bag

clamp (see

figure 8), then connect the duct-

ing. refer to

collection system on the next

page for grounding requirements.

figure 11. typical fasteners for mounting dust
collector bracket to masonry or concrete walls.

anchor stud

lag shield anchor

and lag screw

— if mounting to a concrete or masonry wall,

attach the bracket using lag shield anchors
with lag screws or anchor studs (see

figure 11).