Chapter 7 Global Meter Setup
Ö
To change the TIME DELAY FOR RELAY 1 OR RELAY 2, follow these steps:
PRESS MAX/MIN/LIMITS, AT ANY TIME, TO CANCEL BEFORE STORING THE LAST DIGIT OR SWITCH.
MAX
AC VOLTS
A B C N
AC AMPS
MAX/MIN
LIMITS
VOLTS
PRINT
PROG
PHASE
NEXT
0.
AMPS
B C A
I I I
A B C
N N N
I I I
A B C
LM2
LM1
MIN
MAX
AC VOLTS
A B C N
AC AMPS
MAX/MIN
LIMITS
VOLTS
PRINT
PROG
PHASE
NEXT
04.
AMPS
B C A
I I I
A B C
N N N
I I I
A B C
LM2
LM1
MIN
060
Step 1:
a. Enter Group Level of Programming Mode
(see Chapter 6).
b. Press MAX/MIN/LIMITS until 0. appears.
c. Press VOLTS to activate the Group.
Step 2:
To program Relay 1:
a. Press MAX/MIN/LIMITS until 04. appears in upper
display.
To program Relay 2:
a. Press MAX/MIN/LIMITS until 05. appears in upper
display.
Ö
Lower display indicates current Time Delays.
MAX
AC VOLTS
A B C N
AC AMPS
MAX/MIN
LIMITS
VOLTS
PRINT
PROG
PHASE
NEXT
04
AMPS
B C A
I I I
A B C
N N N
I I I
A B C
LM2
LM1
MIN
_
I2
MAX
AC VOLTS
A B C N
AC AMPS
MAX/MIN
LIMITS
VOLTS
PRINT
PROG
PHASE
NEXT
04.
AMPS
B C A
I I I
A B C
N N N
I I I
A B C
LM2
LM1
MIN
I25
Step 3:
a. Press VOLTS and two dashes appear in lower
display.
b. Press MAX/MIN/LIMITS and three dashes appear in
lower display.
c. Press PRINT/PROG for desired number.
•
Press PRINT/PROG once and the blank signifies a
zero.
•
Press PRINT/PROG twice and 1 appears.
d. Press VOLTS to store.
Ö
Repeat this procedure until desired value is entered.
Ö
Lower display indicates the current Time Delay.
See Chapter 12 to Exit.