Notice – Furuno 2127 User Manual
Page 12
1. MOUNTING
1-4
O-ring
Radiator bracket
Waveguide
Antenna radiator
Hex bolt (M8x40), 8 pcs.
(XN20AF, XN24AF)
Hex. bolt (M8x35), 8 pcs.
Flat washer
Spring washer (XN12AF)
Guide pin
(XN20AF,
XN24AF
only)
Fastening the radiator to the radiator bracket
Fastening the antenna unit to the mounting platform
The antenna unit may be assembled before hoisting it to the mounting platform. However,
do not lift the antenna unit by the radiator. Always hold the unit by its housing. When using a
crane or hoist, lift the unit by the hoist rings which should be fastened to the bolt fixing
covers of the antenna housing.
NOTICE
NO!
- To hoist antenna unit aboard vessel, attach ropes to lifting fixtures and hoist unit with crane.
- To remove load from radiator when hoisting, the length of the rope between the radiator base
and the hook on the should be at least 130 cm.
- To keep the rope away from the radiator, turn the radiator and chassis approx. 30 degrees as
shown below.
- Be sure to remove the lfiting fixtures after hoisting is completed.
130cm
Approx.
30 deg.
Lifting fixture
Lifting fixture
Crane
(Top view)
NO!
Lifting
fixture
1. Construct a suitable mounting platform referring to the outline drawing at the end of this
manual.
2. Drill four mounting holes of 15 mm diameter and one cable entry hole of about 50 mm
diameter in the mounting platform.
3. Lay the rubber mat (supplied) on the mounting platform.
4. Place the antenna unit on the rubber mat, orienting the unit so the bow mark on its base