beautypg.com

1 unpacking the delivery unit, 3 setting up the primecenter m1 19-inch rack, Unpacking the delivery unit – FUJITSU Primecenter M1 BS2000 User Manual

Page 29: Setting up the primecenter m1 19-inch rack

background image

29

Unpacking and checking the delivery unit

4.1

Unpacking the delivery unit

I

For a description to unpack the PRIMECENTER M1 19-inch rack please
refer to the info-sheet delivered with the rack.

4.2

Rolling off the PRIMECENTER M1 19-inch
rack from the transport palette

I

For a description to roll off the rack from the transport palette please refer
to the info-sheet delivered with the rack.

4.3

Setting up the PRIMECENTER M1 19-inch
rack

Introduction

To ensure that the rack has a firm foothold, it is necessary to align it in all 3 axis
exactly horizontal.

Required tools

The following tools are required to perform this task:

Hexagon key 6 mm

Spirit level