1 unpacking the delivery unit, 3 setting up the primecenter m1 19-inch rack, Unpacking the delivery unit – FUJITSU Primecenter M1 BS2000 User Manual
Page 29: Setting up the primecenter m1 19-inch rack
29
Unpacking and checking the delivery unit
4.1
Unpacking the delivery unit
I
For a description to unpack the PRIMECENTER M1 19-inch rack please
refer to the info-sheet delivered with the rack.
4.2
Rolling off the PRIMECENTER M1 19-inch
rack from the transport palette
I
For a description to roll off the rack from the transport palette please refer
to the info-sheet delivered with the rack.
4.3
Setting up the PRIMECENTER M1 19-inch
rack
Introduction
To ensure that the rack has a firm foothold, it is necessary to align it in all 3 axis
exactly horizontal.
Required tools
The following tools are required to perform this task:
–
Hexagon key 6 mm
–
Spirit level