INSTALLATION
Water treatment
Existing system- It is essential that prior to installing the new
boiler the system is thoroughly flushed.
New system- For optimum performance after installation, the
boiler and its associated central heating system should also be
flushed.
Flushing shall be carried out in accordance with BS 7593, a
chemical cleanser can be used either Sentinel X300, X400 or
Fernox F3 are suitable.
It is recommended to flush existing systems first before fitting
the new boiler.
• Ensure all cleanser is removed from the whole system before
adding an inhibitor.
For long-term corrosion protection after flushing, an inhibitor
suitable for stainless steel heat exchangers can be used. Either
Sentinel X100 or Fernox F1 inhibitor can be used.
The boiler is suitable for use on systems using softened water.
7.3
Dimensions
418
344
130
346
740
7.4
Mounting
• Make sure that the equipment used for implementing the
installation is compatible with that of the appliance.
• Determine the assembly location. See the "Appliance
location" chapter.
735
709
63
156
160
160
Ш105*
Ш125*
Ш130**
Ш150**
=246=
170
65
65
58
58
*
60/100 flue
** 80/125 flue
• Take the wall template and place in the desired position
on the wall, giving due consideration to the required boiler
clearances, see chapter "Appliance location ► Clearances",
and the flue you are fitting.
7.4.1
fixing to the wall
130
90°
6
5
4
1
2
3
Key
1 Wall template
2 Standard flue length horizontal
3 2.5° 44mm/metre inclined extended flue length
4 Wall plug
5 Hanging bracket
6 Screw (not supplied)