beautypg.com

Dunkirk DWB Series User Manual

Page 25

background image

9.6 Check Combustion

Natural Gas

1.

Measure input. English unitsTurn off gas to all other

appliances.

• Activate some heating zones to dissipate heat.
• Set boiler on high fi re.
• Use ½, 1 or 2 cu ft dial on gas meter. Measure

time required for one or more complete

revolutions. Measure time for 1-2 minutes.

• Calculate input.

Input (MBH)

=

3600 x cu ft
seconds

Example: Gas fl ow from

Meter = 2 cu ft

Measured time = 72 seconds

Rate (MBH)

=

3600 x 2 cu ft

=

100 MBH

72 seconds

25

Two sampling points are available at top of the boiler, one

for venting and the other for combustion air. To sample:

Open the air/vent outlet plug.

Insert probes all the way in.

Turn on TEST mode, wait 10 minutes for boiler to stabilize;

Take measurement.

Vent Gases Test

Port

Combustion Air Test

Port

A Pressure point upstream

B Pressure point downstream

C Modureg electrical connection

D Protection cap

E Minimum pressure adjustment

F Modureg

G Maximum pressure adjustment

I Gas valve electrical connection

N Compensation tube

9 - START UP PROCEDURE

Figure 18 - Test Ports

Figure 19 - Gas Valve

Combustion Minimum/Maximum

Natural Gas

High Fire - CO

2

at 100 (%)

7.3 - 7.8

Low Fire - CO

2

at 33 (%)

3.0 - 5.0

Table 7 - Combustion Table

N
C

D

B

A

D

N

C

E

G

F

I