beautypg.com

Installation, Unpack and setup procedure – PRG V676 Installation & Operation Manual User Manual

Page 17

background image

V676

®

CONTROL CONSOLE INSTALLATION & OPERATION MANUAL

7

INSTALLATION

Unpack and Setup Procedure

Step

1. Remove all components from shipping container (Figure 4).

Step

2. Place console on a sturdy table or other flat surface.

Figure 4: Unpacking the V676 Console Contents

AC Power Cable

Desk Lamp (2)

Console