Installation, Unpack and setup procedure – PRG V676 Installation & Operation Manual User Manual
Page 17

V676
®
CONTROL CONSOLE INSTALLATION & OPERATION MANUAL
7
INSTALLATION
Unpack and Setup Procedure
Step
1. Remove all components from shipping container (Figure 4).
Step
2. Place console on a sturdy table or other flat surface.
Figure 4: Unpacking the V676 Console Contents
AC Power Cable
Desk Lamp (2)
Console