MTS Criterion 40 - Installation and Commissioning Plan User Manual

Page 9

background image

Installation and Commissioning Plan


MTS Criterion

TM

Series 40

9

Item Description

Performed

On Site

A3.3

Additional Purchased Options:

-

Calibrations: See section C1.0 if purchased.

-

System performance demonstrations: See section
C2.0 if purchased.

-

Custom test method creation: See section C3.0 if
purchased.

-

On-site computer integration: See section C4.0 if
purchased. On-site computer integration does not
include peripheral or network integration. If time
permits at the end of the installation, the FSE will
assist your Information Services Technician with
the integration of peripherals and network
capabilities. The FSE is not trained in information
systems troubleshooting techniques and is not
responsible for compatibility issues regarding the
integration of devices other than those required for
communication with the MTS-supplied controller.