A3.0 system configuration and functional checks – MTS Criterion 40 - Installation and Commissioning Plan User Manual

Page 8

background image

Installation and Commissioning Plan


8

MTS Criterion

TM

Series 40

A3.0 SYSTEM

CONFIGURATION AND FUNCTIONAL CHECKS

All required activities are to be completed prior to the start of any training

activity. The system will also be checked to ensure that all components are

operating as intended. Depending on the system configuration, the following

activities will be performed.

Item Description

Performed

On Site

A3.1

Load unit functionality checks:

- Verify

communication

and operation via handset.

Verify handset commands generate proper
crosshead response/motion.

-

Verify Emergency Stop and limits are functional.

-

Verify position control and speed accuracy.

-

Verify signal response and display readings for
position, load, and strain (if applicable).

A3.2

Software functionality checks:

-

Verify proper system parameters in TwDiag_I
program.

-

Verify TEDS (Self-ID) operation of each load cell
and extensometer.

-

Verify system operation in closed loop control.

-

Verify operation of emergency and safety features.

-

Verify the operation of any additional accessories
purchased from MTS.