B2.0 review and training – MTS Criterion 40 - Installation and Commissioning Plan User Manual

Page 12

background image

Installation and Commissioning Plan


12

MTS Criterion

TM

Series 40

B2.0 REVIEW AND TRAINING

This introduction provides a brief overview of the supplied equipment. It is not

intended as a substitute for formal training. MTS strongly recommends formal

classroom training at the MTS facility in hardware and software operation and

maintenance.

Note: The customer shall supply specimens to be used during the system

introduction. Typically, FSEs are trained in the operation and setup of

MTS testing systems, but are not trained in the performance/procedure of

specific tests.

Item Description

Performed

On Site

B2.1 Loading

test

methods.

B2.2 Running

tests.

B2.3

Saving, naming, and exporting data.

B2.4 Printing

reports.

B2.5

Backing up and restoring data.

B2.6 Defining

function

-

Make simple changes to the test flow.

-

Configure inputs.

-

Use the formula builder to write simple results
formulas.