A4.0 system introductioin – MTS Criterion 40 - Installation and Commissioning Plan User Manual

Page 10

background image

Installation and Commissioning Plan


10

MTS Criterion

TM

Series 40

A4.0 SYSTEM INTRODUCTIOIN

This introduction provides a brief overview of the supplied equipment. It is not

intended as a substitute for formal training. MTS strongly recommends formal

classroom training at the MTS facility in hardware and software operation and

maintenance.

Item Description

Performed

On Site

A4.1

System components:

-

System startup and shutdown.

-

Emergency and safety features: Emergency Stop,
crosshead limits, test area enclosure, and location of
circuit breakers/fuses.

-

Connecting transducer, which includes methods of
safe handling, selecting capacity for proper
application, and calibrating.

-

Login into testing software.

A4.2

Using testing software:

-

Accessing and using the Help System.

-

Setting up user login names and managing the data.

-

Configuring the user interface such as the
appearance of meters, graphs, and sash positions.

-

Setting up additional transducers within the testing
software.