Final configuration and training, B1.0 final functional checks and configuratioin – MTS Criterion 40 - Installation and Commissioning Plan User Manual

Page 11

background image

Installation and Commissioning Plan


MTS Criterion

TM

Series 40

11

FINAL CONFIGURATION and TRAINING

B1.0 FINAL FUNCTIONAL CHECKS AND CONFIGURATIOIN

Item Description

Performed

On Site

B1.1

Create backup of all critical files.

B1.2

Create up to three basic methods according to user-

defined specifications. Basic methods are created from a
standard compression, tensile, or peel method template.
Refer to section A1.5 for definitions of method
modifications.

B1.3

Verify that test methods are working and the results are

acceptable / calculated correctly.

B1.4

Clean up/organize the system workspace. Tie-wrap loose

cables, close machine panels, and so forth.

B1.5 For computers purchased through MTS, complete the

warranty registration.