beautypg.com

HT instruments MACROTEST 5035 User Manual

Page 75

background image

MACROTEST

5035

EN - 74

11.6. SHORT CIRCUIT FAULT IMPEDANCE (Z

PN

, Z

PP

)

Check that the tripping power of the RCD is higher than the maximum fault current of the
installation.

INSTALLATION PARTS TO BE CHECKED

The test shall be effected in the point where the short circuit current is the highest
possible, usually immediately downstream the RCD to be checked.
The test shall be effected between phase and phase (Z

pp

) in the three phase installations

and between phase and neutral (Z

pn

) in the single-phase installations..


ALLOWABLE VALUES

Three-phase installations:

Single-phase installations:

Pi

Zpp

>

400

2

3

*

Pi

Zpn

>

230


dove: P

i

= tripping power of the RCD

Z

pp

= impedance measured between phase and phase.

Z

pn

= impedance measured between phase and neutral


11.7. FAULT LOOP IMPEDANCE MEASUREMENT (PHASE – EARTH)
PURPOSE OF THE TEST
The fault loop is the circuit of the current when there is a bad isolation of the electrical
system toward earth. The fault loop is composed:

- Transformer coil impedance.
- The impedance of the line from the transformer to the fault.
- The impedance of the protective conductor from the conductive part to the neutral of

the transformer.


When the instrument measures fault loop impedance, it detects the prospective phase-PE
short-circuit current. So the operator can determinate if magnetothermical protection is
coordinated to the protection of indirect contacts.

ATTENTION: The resolution of the instrument is 10m

Ω when the impedance value is

inside (0.01 – 19.99)

Ω, so use the instrument for measurements of

impedance higher of 100m

Ω.


PLANT PARTS TO BE VERIFYED
The test is necessary in TN or IT electrical system without RCDS.

ALLOWABLE VALUES
The following relation has to be fulfill:

Z

S

≤ U

o

/ I

a


where: U

o

= Phase-Earth Voltage.

Z

S

= Impedance Phase-Earth.

I

a

= Tripping current of the magnetothermical protection in 5 seconds.